View
WE HELP SME's WIN MORE 
PUBLIC SECTORCONTRACTS
National Framework Partnership

Renewables Framework including Solar PV and Ventilation

Live

Framework Description

The National Framework Partnership (NFP) Renewables Framework including Solar PV and Ventilation covers solar photovoltaic systems and ventilation technology for public sector buildings. It runs until 1 October 2027 and is a framework rather than a Dynamic Purchasing System, with applications closed, so its supplier list stays fixed for the term. Clients can select a supplier directly or run a mini-competition.

Context & Use Case

Councils, schools and health bodies use it to fit solar PV to their buildings and to install or upgrade ventilation, typically to cut energy use and carbon or to improve indoor air quality. A call-off might run from a feasibility study and design through to installation and ongoing maintenance, and ventilation work can range from mechanical and heat recovery systems to natural ventilation strategies.

Scope of Services

Feasibility advice on solar PV and ventilation Design of solar PV and ventilation systems Installation of solar panels and ventilation systems Ongoing maintenance and support Mechanical, heat recovery and natural ventilation

Lots

See framework link

Who Can Apply

Suits solar PV installers and ventilation specialists with the accreditations needed for public sector work. Applications were taken at the outset, so new suppliers cannot join until re-procurement, likely around October 2027.

Buyer Benefits

Buyers under pressure to meet carbon targets want to move from feasibility to installation without a lengthy tender. One route covering design, installation and maintenance means fewer hand-offs, and pairing solar with ventilation lets a client tackle energy use and indoor air quality in a single project.

Next Steps

Appointed suppliers should prepare energy-saving and payback evidence for mini-competitions. Others should plan for the re-procurement expected around 1 October 2027, alongside several related NFP heating and metering frameworks ending the same day, and monitor the NFP framework page for the notice.

How Athena Can Help

Renewables tenders reward clear evidence of carbon and cost savings. If you are appointed, Athena's solar bid specialists can turn your installation results into win themes for mini-competitions and model a competitive price for each scheme.

If you want a place when NFP re-procures, our support with framework entry plans your 2027 application and prepares accreditations and case studies, and our help with public sector bidding supports solar and ventilation tenders from councils and schools in the meantime.