View
WE HELP SME's WIN MORE 
PUBLIC SECTORCONTRACTS
YPO

Road Marking, Surfacing and Traffic Management DPS - 772

Live

Framework Description

YPO's Road Marking, Surfacing and Traffic Management DPS (772) is a Dynamic Purchasing System for road marking and surfacing products, equipment and installation, retro-reflectivity equipment and testing, and temporary traffic management. It has five lots and runs until 24 February 2029, with no extension. Suppliers can apply to join at any point while it is open.

Context & Use Case

Highway authorities and other public bodies use 772 for marking, removal and surfacing work on highways, car parks, footpaths, cycle paths, sports grounds and runways, including permeable and non-permeable surfaces. Retro-reflectivity lots help them check that markings stay visible, and the traffic management lot keeps works safe. Each requirement is competed among admitted suppliers in the relevant lot.

Scope of Services

Lot 1: Supply of road marking, surfacing and removal products and equipment Lot 2: Supply and installation of road marking, surfacing and removal products Lot 3: Supply of retro-reflectivity equipment Lot 4: Retro-reflectivity testing services Lot 5: Supply and installation of temporary traffic management

Lots

Lot 1 - Supply of road marking, surfacing, removal products and equipment; Lot 2 - Supply and installation providers for road marking, surfacing, removal products and...; Lot 3 - Supply of retro-reflectivity equipment; Lot 4 - Service providers for retro-reflectivity testing services; Lot 5 - Supply and installation of temporary traffic management

Who Can Apply

Road marking contractors, surfacing installers, product manufacturers, retro-reflectivity testing firms and traffic management companies can apply now, as long as they meet YPO's criteria for each lot. Admission does not guarantee work, but it lets you bid in every competition for your lots until 24 February 2029.

Buyer Benefits

Faded markings and poor surfaces are safety and liability risks, and highway teams want contractors they can appoint quickly. A DPS gives them suppliers already checked, and the separate testing lot lets them measure retro-reflectivity independently. Having traffic management in the same system means the safety arrangements can be bought alongside the works.

Next Steps

Download the DPS documents from YPO's page (https://www.ypo.co.uk/frameworks-home/900249), choose the lots that match your business, and prepare evidence such as relevant accreditations, product certifications and traffic management qualifications. Apply through YPO's portal; once admitted, set up a fast process for responding to competitions before the DPS closes on 24 February 2029.

How Athena Can Help

Because 772 is an open DPS, Athena can prepare your application straight away. Our help applying to dynamic markets chooses lots across marking, testing and traffic management, writes the selection answers and checks compliance before you submit.

After admission, our bid management for DPS competitions provides reusable method statements and pricing for marking and surfacing jobs, and our highways tender guidance helps you pick competitions you can win and price them so they stay profitable.